Get on the path to results today.

Infravise LLC

Infravise LLCInfravise LLCInfravise LLC

Infravise LLC

Infravise LLCInfravise LLCInfravise LLC
  • Home
  • Services
  • Results
  • Contact
  • Policy
  • Blog
  • More
    • Home
    • Services
    • Results
    • Contact
    • Policy
    • Blog
  • Home
  • Services
  • Results
  • Contact
  • Policy
  • Blog

BUSINESS OUTCOMES

Success Stories

Floating web related common icons over black reflective background. Hand with mirrored reflection.

An estimated $10M in cost avoidance and a 35% internal reduction in infrastructure related COGS

An estimated $10M in cost avoidance and a 35% internal reduction in infrastructure related COGS

An estimated $10M in cost avoidance and a 35% internal reduction in infrastructure related COGS

Product Renewal

A major international IT service integrator was losing client base on their shared data protection service due to the high cost per GB protected. Cost drivers included labor related to multi-vendor product complexity and high touch legacy methods. The solution design will avoid a $20M sustainment cost with an $8 -10M spend while lowering the cost per GB to competitive levels.

Finger touching large automobile touchscreen display. Serial number and wireframe car in background

75% reduction in Azure related storage costs for a savings of $1.8M/yr

An estimated $10M in cost avoidance and a 35% internal reduction in infrastructure related COGS

An estimated $10M in cost avoidance and a 35% internal reduction in infrastructure related COGS

Service Management

Not all data is equal. A multi-national client was incurring monthly Azure storage fees in excess of $200K/mo. A detailed investigation  revealed that a single service was treating all data as business critical and applying geo-redundant protection. Resilience and retention were adjusted to appropriate levels based on true data criticality.

Two fingers on a laptop keyboard. Screen displaying modern performance dashboard graphics

$3M vendor obligation relief due to non-performance

An estimated $10M in cost avoidance and a 35% internal reduction in infrastructure related COGS

$3M vendor obligation relief due to non-performance

Project Management

During a major, multi-vendor product development initiative, a large international development shop failed to produce defined deliverables. Sound commercial task order language and detail enabled appropriate recourse. 

Experience, Credibility and Trust Built on the Front Lines


CIO Level   "... an exceptional individual and technologist. I was continually impressed with his attention to detail and his willingness to do what it took to deliver ... I would never hesitate to recommend him for any opportunity presented."


Sr. Director Level  "... the strongest engineer/architect I have ever encountered. His work in designing and deploying our High Availability architecture was instrumental in improving reliability from 97% to 99.9% ... I would unhesitatingly recommend him to anyone.""


Infravise LLC

TOGAF 9 Certified Enterprise Architect

Greg@Infravise.com

TOGAF® 9 CERT #133849

Member AEA 57594698 

Copyright © 2021 Infravise - All Rights Reserved.

Texas Veteran